Kiata Overtaking Lane /

Image

What

• Construction Management
• Estimating & Cost Management
• Project Management

Who

VicRoads

Where

Kiata, Victoria

Australia’s biggest public transport project

Sydney Metro is a future automated rapid transit system in Sydney, New South Wales, Australia. Sydney will be the first Australian city to build a metro system. The network will be controlled by Sydney Metro which was established in July 2018 and is an operating agency owned by the NSW Government. It has been announced that Jon Lamonte will be the Chief Executive of Sydney Metro, which will be part of Transport for NSW's Opal ticketing system.
Capacity
Eight-car trains have a design capacity of 1,539 customers, and increasing the running frequency to ultimately 30 trains per hour (2 minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.[67] The line will run 21 or 22 hours.
System length
66 km (41 mi)
Track gauge
1,435 mm (4 ft 8 1⁄2 in)
Route
The original North West Rail Link route proposal was planned to be 22 km (14 mi) in length, consisting of a 16 km (9.9 mi) tunnel (underground) section from Epping to the proposed Burns Road Station, followed by a 4 km (2.5 mi) section above ground from Burns Road Station (now Kellyville Station) to Rouse Hill. A train stabling facility was proposed to the north west of Rouse Hill Town Centre.
Completion
On 14 January 2019 the first driverless Metro train completed the full journey between Tallawong and Chatswood.
Image

Want to Discuss
Your Upcoming Project?

Contact us

MILLERS Civil will help you get things done

Image

132 Stawell Rd
Horsham VIC 3400

PO Box 241
Horsham VIC 3400